Have a question? Call us on 0333 772 0250
Regrettably our website does not render correctly in IE 11, please use a different browser
Please bear with us while we gather your data
This document does not exist
BBVS & HS2 Station Furniture - HS2 Phase 1 Stations - Old Oak Common (S4) Station
Published: 13/5/2025
Contract
Document Hidden in Searches
Balfour Beatty VINCI Systra JV
349284 00
Urban furniture
CPV Structure
34928 000
Road furniture
3492 0000
Road equipment
349 00000
Miscellaneous transport equipment and spare parts
34 000000
Transport equipment and auxiliary products to transportation
Location
London London & -2 more
Matches
No Value Specified
Value
£2,500,000
Range
£2,500,000
£5,000,000
Duration
4.3 years
Start Date
3/08/2026
Contract Dates
3/08/2026
2/12/2030
Translated from:
English
Response Languages:
English
Single Lot
Not yet announced
on 
Framework
Dynamic Purchasing System (DPS)
CPV Code Breakdown
39
66.7%Furniture (incl. office furniture), furnishings, domestic appliances (excl. lighting) and cleaning products
391 00000
Furniture
3915 0000
Miscellaneous furniture and equipment
34
33.3%Transport equipment and auxiliary products to transportation
349284 00
Urban furniture
Accurate Closing Date Not Provided
PINs are a preliminary announcement
Closed : 30/5/2025
Finished
Publisher Details
Astral House Imperial Way
Watford
WD244WW
UK
Contact Details
Award Criteria
    Not Specified
If you have a problem with this link visit here first
Why
PRO
Summary
BBVS are looking for Station Furniture suppliers for HS2's Old Oak Common Station. BBVS & HS2 are looking for a furniture designer, manufacturer, and fabricator for a bespoke range of furniture items which are to be adopted across the HS2 Phase 1 Stations (Old Oak Common Station, Euston Station, Birmingham Curzon Street & Birmingham Interchange).
BBVS are issuing this advertisement to gain interest and a sense of capabilities within the market to support in the development of this work. Specific activities that would be required under this piece of work include
-Detailed Design Development of Station Furniture Concept Design developed by HS2
-Developed Mock Ups and Prototypes of the Proposed Station Furniture Products
-Support in undertaking user testing of the proposed Station Furniture products
-Certify and assure the proposed Station Furniture Products (Fire, Security & Blast certification etc)
-Develop and provide unit costs for each product within Station Furniture products
-Manufacture and Installation all Station Furniture Products for all the HS2 Stations
-Potentially support in the maintenance contract of Station furniture elements for HS2 Stations.
Lots